New Building
- Identifies Potential Deficiencies Before Project Turnover
- Validates System Functionality & Performance
- Reduces Construction Project Turnover Schedules
Existing Building
- Addresses Poorly Performing Systems
- Phased Renovations
- Improves Occupant Comfort & Indoor Air Quality
- Reduces Costly Service Calls
- Develops A Remediation Plan To Restore Performance
Concord Commissioning Projects
New York - Presbyterian Hospital CUIMC Cancer Center Commissioning
Concord Engineering is the third-party commissioning agent for the new 500,000ft Cancer Center at NYP CUIMC.
- Extensive industry experience that enables coordination across disciplines
- Track record for meeting rigorous energy efficiency requirements
- Documentation and training to ensure personnel understand the new systems
United Airlines New Catering Operations Facility Commissioning
This project entailed ensuring the HVAC and Refrigeration Systems were installed and operated per the overall project intent.
- Installation Coordination
- Startup Planning
- Final Functional Testing
Big Kahuna’s Water Parks Rooftop Unit Replacements
Concord Engineering / Concord Management Services executed a design build project including the replacement of four large rooftop air handlers serving the primary indoor waterpark area including new ductwork.
- Developed cost estimate from 20% design drawings
- Equipment procurement early in the design phase
- Managed contractor execution and overall project delivery
Mount Sinai Medical Center Emergency Generator
Third-party commissioning agent for the emergency power upgrade to the main campus.
- Completed work without any operational disruptions
- Transparent budget and on-time delivery of results
The Health & Life Science Exchange “HELIX”
Concord Engineering has assisted the project owner with detailed drawing review for MEP and Building Envelope Systems.
- Detailed design review
- Coordination with the owner and design team on project expectations
- Offered design improvements based on Concord experience
Philadelphia Public Safety Building
Third-party commissioning agent to execute the fundamental and enhanced commissioning necessary for LEED compliance.
- Multiple laboratories met complex BSL-3 requirements
- Collaborated cross-functionally for design-build approach
- Advocated on behalf of the City to ensure construction and engineering design would achieve their goals
New York Presbyterian Hospital Cancer Center
Concord Engineering has assisted the NYP Operations and Capital Improvements Team with technical review of design documents.
- Developed detailed OPR for NYP
- Assisted design team with the development of the BOD
- Offered design options for LL97 project compliance
Rutgers Rowan Health Science Center
Third-party commissioning agent to confirm the proper installation of the building envelope and MEP systems.
- Performed functional testing during building occupancy without impacting operation
- Transparent budget and on-time delivery of results
- Confirmed the proper installation of the building envelope and MEP Systems
Hackensack University Medical Center New Pavilion Tower
Third-party commissioning agent to execute the fundamental and enhanced commissioning necessary for LEED compliance.
- LEED Silver Certification
We don’t just observe symptoms; we diagnose the problems & provide the solutions that make your facility work!
GET IN TOUCH
TALK TO US ABOUT A PROJECT?
Do you have an upcoming project you would like to discuss in detail?
Ready to start a conversation? Call for more info or to learn how we can be the perfect partner for your next project.
Call: 856-427-0200 (x111)Jennifer Martin - Marketing ManagerConcord Engineering Group
This site is protected by reCAPTCHA.
The Google Privacy Policy and Terms of Service apply.